Module 1 - Basics
Enrolment options
Course image
Learning unit summary:
The renovation of sewers and pipelines with "Lining with cured-in-place pipes" is an established standard construction method, starting with the planning process, through material production and installation, right up to checking the quality achieved. It is characterized by a wide range of applications and a high variance in the fabrication and application processes. This module teaches the essential basics in relation to the fabrication of the lining tube and its installation.
LEARNING OUTCOMES
- wall construction of the lining tube;
- possible uses and applications of CIPP liner;
- preparatory work, installation variants and the curing process;
- advantages and disadvantages of the various curing methods and requirements for structural verifications.
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: STEIN Ingenieure GmbH / 2022
3 h
Lining with Pipes
Guests cannot access this learning unit. Please log in.