Lining with Cured-In-Place Pipes (Curing with Hot Water)
Enrolment options
Course image
Learning unit summary:
Lining of a vitrified clay sewer nominal width DN 200 with a flexible tube (DS CityLiner) impregnated with a reactive resin, forming a pipe after curing of the resin (CIPP).
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: R. Stein (2004)
Lining with Pipes
Guests cannot access this learning unit. Please log in.