Virtual Construction Site: Dynamic Pipe Bursting
Enrolment options
Course image
Learning unit summary:
Replacement of a damaged pipeline over the length of two sections, consisting of DN 300 concrete pipes, in trenchless construction using the dynamic bursting method with simultaneous insertion of a DN 300 HDPE pipe string with an outside diameter of 350 mm.
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: R. Stein (2019)
Pipe Bursting, Pneumatic
Guests cannot access this learning unit. Please log in.