Zum Hauptinhalt
Kursbild" BE-02 Open Cut Method: Embedment Zone
Kursbild
Beschreibung

The embedment consists of bedding, side filling and initial and main cover. The quality of the embedment is significantly influenced by the installation conditions of the pipes. Other topics of this module include flowable fill for trench backfill, optimized installation methods and compaction tests.

LEARNING OUTCOMES

  • rules and regulations;
  • requirements for the embedment zone and compaction of the trench backfill;
  • process sequences of the open cut method;
  • influencing factors to ensure high execution quality on the construction site;
  • recognizing and assessing errors in construction.

Publisher: Prof. Dr.-Ing. Stein & Partner GmbH / 2019

Modules
Kursbild" Renovation: Lining with Continuous Pipes - Part II - Applied Material
Kursbild
Beschreibung

In this module, the fundamentals of the materials applied in the lining processes with continuous pipes are presented and discussed.

Publisher: Prof. Dr.-Ing. Stein & Partner GmbH / 2006

Modules
In neuem Fenster öffnen