Skip to main content

Enrolment options

Course image" NA-21 - Trenchless Construction: Introduction
Course image
Learning unit summary:

Today, the installation of gas, water, and wastewater pipelines is still predominantly carried out using the open trench installation. In view of the numerous disadvantages associated with this method, it is imperative that in the future trenchless pipeline construction be considered much more strongly as an alternative in the planning and construction of sewers and pipelines. For a better understanding of the complexity of the inner-city subsoil, this module provides a brief introduction to infrastructures in the urban subsoil.

LEARNING OUTCOMES

  • prerequisites for a functioning infrastructure;
  • options for new pipeline construction;
  • procedures for trenchless pipeline construction; and
  • advantages over the open cut method.

Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: STEIN Ingenieure GmbH / 2008

Trenchless Installation of Pipelines
Guests cannot access this learning unit. Please log in.
Open in new window