Replacement
Course image
Learning unit summary:
Replacement of a damaged pipeline over the length of two sections, consisting of DN 300 concrete pipes, in trenchless construction using the dynamic bursting method with simultaneous insertion of a DN 300 HDPE pipe string with an outside diameter of 350 mm
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: R. Stein (2019)
Replacement