Zum Hauptinhalt
Kursbild" BE-01 Wastewater Collection Systems and their Significance in Water Management
Kursbild
Beschreibung

Lining methods for the renovation of sewers and pipes represent the largest group of renovation methods. In the case of the lining processes self-supporting full linings of sewers are produced on the basis of prefabricated pipes, locally manufactured pipes and locally manufactured and hardening pipes. The subject of this course is "Lining with Cured-In-Place Pipes (CIPP)" and " Lining with Spirally-Wound Pipes".

In addition to the description of the procedure and process, the course deals in particular with the areas and limits of application, advantages and disadvantages as well as possible remediation errors and quality assurance options.

The course contains didactically prepared expert knowlege in 5 modules:

  1. Lining with Cured-In-Place Pipes (CIPP) - basics
  2. Lining with Cured-In-Place Pipes (CIPP) - Processes
  3. Lining with Cured-In-Place Pipes (CIPP) - Details on the Installation of UV Cured-In-Place Pipes
  4. Lining with Cured-In-Place Pipes (CIPP) - final work, acceptance, renovation defects
  5. Lining with Spirally-Wound Pipes with Stationary Winding Machine without Reinforcement made of Metal or Plastic

LEARNING OUTCOMES

                

After successfully completing this course, you will be able to

  • Name and apply the most important rules and regulations
  • Name lining methods, their areas of application and limitations as well as their advantages and disadvantages
  • Select suitable lining methods depending on damage and boundary conditions
  • Coordinate sampling and material testing
  • Identify the causes of refurbishment errors and describe quality assurance options
  • Recognise influences on the extension or reduction of the service life
  • Select suitable methods for connecting to manholes and structures and connecting pipes.

700 € plus VAT / 2023

30 H / 4 Weeks

Planning and Management
Kursbild" Introduction to Civil Engineering for Process Designers
Kursbild
Beschreibung

The overall challenge of each generation that takes over responsibility for a drain and sewer system is to construct new wastewater collection systems or to expand already existing ones, and to inspect, repair, renovate and replace, or rather adapt, them to the strengthened groundwater and water protection standards. The primary objective of all measures has to be the creation of a fully operational and long lasting drain and sewer system. This is created to transport the wastewater safely and efficiently between the producers of wastewater and the wastewater treatment plant. Furthermore, rehabilitation and maintenance work should be easy to carry out. Thus, sound expertise is required in planning, construction, operation and maintenance. This module teaches the most elementary basics needed for a comprehensive design of an integral drain and sewage framework.

LEARNING OUTCOMES

After successfully completing this course, you will have a sound knowledge of:

  • Water cycle (transport and storage of water) at a global and regional level
  • Interactions in the urban water cycle as well as effects on groundwater and waters
  • Facts and figures regarding the global water demand and water exploitation
  • Significance of wastewater collection systems in the overall context of water management
  • Cycle of resources (water collection, water distribution, wastewater discharge, wastewater treatment)
  • Terms and definitions
  • Requirements for wastewater collection systems regarding their functionality and performance capacity
  • Types of wastewater collection systems
  • Structure and limiting conditions of sewer systems

5,5 h
Planning and Management
In neuem Fenster öffnen