Inspection
The documentation of damages, defects, other peculiarities (findings) in sewers and pipes within the scope of CCTV inspection is not possible without a uniform nomenclature. In Europe, EN 13508 Part 2: "Coding system for visual inspection" provides the normative basis for documenting and describing various findings, which later serve the engineer as a basis for assessment.
This module provides the basic knowledge required for the structure and application of the coding system.
LEARNING OUTCOMES
- coding system according to EN 13508-2;
- differentiation between basic information and findings;
- differences in the coding system between sewers and manholes;
- codes for route finding, tightness indication, location on the circumference and
- procedure of inspection in an object.
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH, Editorial: STEIN Ingenieure GmbH / 2023
The aim of this lecture is to provide an overview of the main damage groups, their causes, and their consequences.
Publisher: Prof. Dr.-Ing. Stein & Partner GmbH (2006)
This module provides an introduction to the first of the four basic activities within the framework of integral urban drainage management according to EN 752, the INVESTIGATION. It is intended to cover all performance aspects of the drain and sewer system to the appropriate extent in order to provide the basis for the subsequent assessment of their performance. Therefore, this module provides an overview of the required investigation steps, collection and review of relevant information, and procedures for investigating the structural and operational condition of drain and sewer systems.
LEARNING OUTCOMES
- The purpose of an investigation;
- The necessary investigation steps and required relevant information; and
- Procedures for investigating the structural and operational condition of drainage systems
Published by: Prof. Dr.-Ing. Stein & Partner GmbH, edited by: STEIN Ingenieure GmbH / 2023